Close Menu
Business Voice NowBusiness Voice Now
    Facebook X (Twitter) Instagram
    Business Voice NowBusiness Voice Now
    Subscribe
    • Markets
      • BFSI
      • Capital Goods
    • Business
      • FMCG
      • Retail
      • Quick Commerce
      • Startups
    • Healthcare
    • Technology
    • Energy
    • Voices
      • Entrepreneur – CXO Stories
      • Corporate Office story
    • E Magazine
      • Year 2026
        • August 2026
        • July 2026
    Business Voice NowBusiness Voice Now
    Home»Business»AVP Infracon Secures L1 Status and Multiple New Orders Valued at INR 78.75 Cr Across Highway and Industrial Segments
    Business

    AVP Infracon Secures L1 Status and Multiple New Orders Valued at INR 78.75 Cr Across Highway and Industrial Segments

    WebDeskBy WebDeskNovember 7, 2025No Comments2 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email
    Follow Us
    Google News Flipboard Threads
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Chennai (Tamil Nadu) [India], November 7: AVP Infracon Limited (NSE – AVPINFRA), – AVP Infracon Limited, a leading infrastructure development company with over 15 years of execution excellence, is pleased to announce that it has secured new orders cumulatively valued at approximately ₹78.75 Cr across highway and industrial infrastructure segments.

    Order 1: L1 Status for Major Highway Widening and Strengthening Project

    • Date: 30th October 2025
    • Client: Superintending Engineer, Highways (C&M), Thiruvannamalai
    • Value: Approximately ₹57.57 Cr
    • Scope of Work: Widening from Two Lane to Four Lane and Strengthening of Thiruvannamalai–Thiyagadurgam Road
    • Project Duration: 12 months

    Order 2: Road and Infrastructure Building Works – Logistics Park Development

    • Date: 06th November 2025
    • Client: Reliance Mappedu Multi Modal Logistics Park Limited
    • Value: Approximately ₹12.77 Cr
    • Scope of Work: Construction and development of internal roads and associated infrastructure work within the logistics park
    • Project Duration: 3 months

    Order 3: OSBL RCC Drain Works – Logistics Park Infrastructure

    • Date: 06th November 2025
    • Client: Reliance Mappedu Multi Modal Logistics Park Limited
    • Value: Approximately ₹8.41 Cr
    • Scope of Work: Execution of RCC drain and OSBL infrastructure works within the logistics park
    • Project Duration: 3 months

    The company continues to see strong momentum across the infrastructure segment and remains well-positioned to tap opportunities in roads, bridges, and industrial projects. The Companies ongoing order wins reflect its commitment to sustainable growth, operational excellence, and timely execution.

    Commenting on the receipt of new order, Mr. Prasanna Dhandayuthapani, MD of AVP Infracon Limited, said, “We are delighted to have been awarded L1 status for the Thiruvannamalai–Thiyagadurgam Road project by the Highways Department. The project involves key infrastructure works including the construction of a centre median, retaining wall, junction improvement, reconstruction of culverts, and widening of minor bridges, slab culverts, and RCC box culverts. These enhancements will greatly improve road safety, capacity, and connectivity in the region.

    In addition, our new industrial infrastructure orders from Reliance Mappedu Multi Modal Logistics Park Limited mark an important step in expanding our presence in the logistics and industrial development segment. These projects involve critical works such as internal road construction, drainage networks, and allied civil infrastructure, further strengthening our relationship with leading private-sector clients.

    If you object to the content of this press release, please notify us at pr.error.rectification@gmail.com. We will respond and rectify the situation within 24 hours.

    Business
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    WebDesk
    • Website

    Related Posts

    Bamboo summit in Mumbai to bring state’s bamboo policy before investors

    September 18, 2026

    Global Experts Deliberate on Democracy in the Age of AI at DSVV

    September 17, 2026

    Prime Car Care Is Changing How People Discover PPF — Before the Damage, Not After

    September 17, 2026

    Comments are closed.

    Recent Post
    • Bamboo summit in Mumbai to bring state’s bamboo policy before investors
    • Global Experts Deliberate on Democracy in the Age of AI at DSVV
    • Prime Car Care Is Changing How People Discover PPF — Before the Damage, Not After
    • Dyslexia Symptoms in Children Often Mistaken for Laziness, Says Indore based Child Psychologist Dr Vini — Here’s What Parents Should Know Before Exam Season
    • Signoff Launches Enterprise Agentic AI Intelligence Platform
    • Captain Polyplast Secures Rs 47 Cr Order from MSEDCL for 2,000 Solar Pumps
    • Allwyn Bikes Enters a New Chapter with Exclusive Bicycle Launch, Bringing German Design to Indian Manufacturing
    • Captain Polyplast Limited Strengthens Solar EPC Order Book with Rs 47 Cr Order for 2,000 Solar Pumps from MSEDCL

    Type above and press Enter to search. Press Esc to cancel.