Close Menu
Business Voice NowBusiness Voice Now
    Facebook X (Twitter) Instagram
    Business Voice NowBusiness Voice Now
    Subscribe
    • Markets
      • BFSI
      • Capital Goods
    • Business
      • FMCG
      • Retail
      • Quick Commerce
      • Startups
    • Healthcare
    • Technology
    • Energy
    • Voices
      • Entrepreneur – CXO Stories
      • Corporate Office story
    • E Magazine
      • Year 2026
        • August 2026
        • July 2026
    Business Voice NowBusiness Voice Now
    Home»Business»KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat
    Business

    KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat

    By October 2, 2023No Comments2 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email
    Follow Us
    Google News Flipboard Threads
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Surat (Gujarat) [India], October 2: KP Energy Limited, a leading player in the renewable energy sector, has achieved a significant milestone by receiving a Notification of Award (NOA) from NTPC Renewable Energy Limited (NTPC REL) for a 464.10 MW Balance of System Package. This package is part of an Inter-State Transmission System (ISTS) Connected Wind Energy project in Gujarat.

    KP Energy clinched the contract from NTPC REL, a subsidiary of NTPC, through a rigorous and highly competitive bidding process, reaffirming its excellence in the renewable energy domain. The project falls under the company’s Captive Power Producer (CPP) business segment.

    Under the contracts, KP Energy will provide a comprehensive suite of services, including Engineering, Procurement, Construction, and Commissioning (EPCC). These services encompass the acquisition and transfer of land for the project, the supply of all necessary equipment for the balance of plant, and the provision of various services related to unloading, storage, on-site handling, installation, insurance, civil and allied works, integration into the grid, testing, and commissioning. Additionally, the company will be responsible for the operation and maintenance of the contract scope for three years, ensuring its optimal performance and reliability.

    Dr. Faruk G Patel, Chairman and Managing Director of KP Group, said, “We are thrilled to receive the Notification of Award for this vital project from NTPC REL. It underscores our strong presence in the renewable energy sector and our expertise in the timely execution of challenging projects. The project aligns with our mission to contribute to sustainable energy solutions and reflects the trust clients have in our project execution capabilities. KP Group remains committed to delivering high-quality renewable energy projects that contribute to India’s green energy goals and promote a cleaner and greener future.”

    As per the contract, the project is slated to be completed within 21 months from the date of the NOA.

    Earlier, KP Energy successfully commissioned a 29.4MW (Phase-II) ISTS-connected wind power project comprising 14 WTGs of 2.1 MW each at Sidhpur site in Devbhumi Dwarka.

    Business
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Bamboo summit in Mumbai to bring state’s bamboo policy before investors

    September 18, 2026

    Global Experts Deliberate on Democracy in the Age of AI at DSVV

    September 17, 2026

    Prime Car Care Is Changing How People Discover PPF — Before the Damage, Not After

    September 17, 2026

    Comments are closed.

    Recent Post
    • Bamboo summit in Mumbai to bring state’s bamboo policy before investors
    • Global Experts Deliberate on Democracy in the Age of AI at DSVV
    • Prime Car Care Is Changing How People Discover PPF — Before the Damage, Not After
    • Dyslexia Symptoms in Children Often Mistaken for Laziness, Says Indore based Child Psychologist Dr Vini — Here’s What Parents Should Know Before Exam Season
    • Signoff Launches Enterprise Agentic AI Intelligence Platform
    • Captain Polyplast Secures Rs 47 Cr Order from MSEDCL for 2,000 Solar Pumps
    • Allwyn Bikes Enters a New Chapter with Exclusive Bicycle Launch, Bringing German Design to Indian Manufacturing
    • Captain Polyplast Limited Strengthens Solar EPC Order Book with Rs 47 Cr Order for 2,000 Solar Pumps from MSEDCL

    Type above and press Enter to search. Press Esc to cancel.